Docs
Steps

Schedule starts / ends

Two exits: when a weekly schedule becomes active, and when it becomes inactive

When step — What starts the flow. Step type when-schedule.

How it works

Fires at the boundaries of a weekly schedule of time blocks, through two exits: Active when a block starts, Inactive when it ends. Blocks can start or end at a clock time or at sunrise / sunset with an offset; an end before the start runs overnight.

Example

Schedule starts / ends (weekdays 9–5) → Active: Control devices (thermostat comfort) → Inactive: Control devices (thermostat eco)

Comfort during work hours, eco outside them.

Options

OptionKeyKindRequiredNotes
Active duringblocksscheduleBlocksyes—

Exits

Two exits: active (the default connection) and inactive (drawn dashed). Connect a step to the second exit to handle the other case.

Wire format

What the step stores in the flow definition's data bag (JSON schema).

Generated from docs-bundle v0.1.0, novon-platform 9ce3486c (2026-10-09).

On this page